The Future of the Building Industry: BIM-BAM-BOOM!
It all begins with BIM; the architect uses 3-D modeling to investigate options and test building performance early on in order to optimize the building’s design. The design is then handed off to the contractor who streamlines the building process with BAM (Building Assembly Modeling), which allows for a significant decrease in construction costs. Once complete, BAM is turned over the owner and becomes BOOM (building owner operator model). This allows the owner to manage the building over time and ensure optimized building performance throughout its entire life cycle.
The real promise of “BIM-BAM-BOOM!” is “better design, better construction, better operation”.
5 Notes/ Hide
-
notational likes this
-
georgevaldes said:
Awesome.
-
georgevaldes likes this
-
georgevaldes reblogged this from ryanpanos
-
super-syrup likes this
-
ryanpanos posted this
